Tuesday, February 10, 2009

1100 Documents To Review

Well, out of these 1100 documents, I don't see the infamous "agreement" in there. You know the one. The agreement that I signed acknowledging I would receive 50% of the base of all jobs plus 100% of the gratuity of all jobs. I do see an agreement to work as an Independent Contractor, but neither the fill-in-the-blank name section nor the signature on it are mine.

Are you people at CTG nuts?

The section on all the documents detailing each run have the cost of the job "intentionally left blank". Not to worry, Mr. Pazzaneze, I KNOW the cost of each run. I KNOW the base of every job. I KNOW how to figure out gratuities. I KNOW "my" client was charged 50.00 per hour, yet I was paid 10.00 per hour. That's not 50%, that's 20% of the base.

You can continue on with this facade and boat load of lies. It just makes my case for me.

No comments: